SCOPE:

  • 55 cabins interior upgrade & public spaces

DURATION:

  • 8 weeks

WORKERS:

  • ~150

WORKS DONE:

  • Installation of wall & ceiling panels
  • Ceiling 720 m2
  • Wall panels with Gislaved foil 2.150 m2
  • Wet units installation 55 set
  • Furniture (production & installation)
  • Doors, window box etc. 55 sets
  • Fixed & loose furniture installation in cabins 55 sets
  • Floors (floating, leveling, top covering)
  • Floor Carpet 600 m2
  • Floor Vinyl 120 m2
  • Insulation works 2.500 m2