Ro-Ro/Passenger Ship “Marco Polo”
Dedicated Customer Teams & Agile Services
Our worldwide presence ensures the timeliness, cost efficiency compliance adherence required to ensure your production timelines are met.
SCOPE:
- 55 cabins interior upgrade & public spaces
DURATION:
- 8 weeks
WORKERS:
- ~150
WORKS DONE:
- Installation of wall & ceiling panels
- Ceiling 720 m2
- Wall panels with Gislaved foil 2.150 m2
- Wet units installation 55 set
- Furniture (production & installation)
- Doors, window box etc. 55 sets
- Fixed & loose furniture installation in cabins 55 sets
- Floors (floating, leveling, top covering)
- Floor Carpet 600 m2
- Floor Vinyl 120 m2
- Insulation works 2.500 m2