Expedition ship “MS Fram”

Dedicated Sales Team

Our worldwide presence ensures the timeliness, cost efficiency compliance adherence required to ensure your vessel timelines are met.

SCOPE:

  • Public zones (Activity/ Science center, Explorer lounge, gym, sauna, and BBQ area.
  • 85 cabins & 20 suites

DURATION:

  • 1 month

WORKERS:

  • ~ 50

WORKS DONE:

  • Engineering & design works
  • Full dismounting works
  • Electrical works
  • Wall preparation and decorative top – covering
  • Floors (leveling, top covering, carpet replacements, vinyl installation, wooden floor vanishing)
  • Ceiling touch up works
  • Furniture (production & installation onboard)
  • BBQ area installation
  • Outdoor installation works