Dredger Elbra R (2 sisterships)

Dedicated Sales Team

Our worldwide presence ensures the timeliness, cost efficiency compliance adherence required to ensure your vessel timelines are met.

SCOPE:

  • Interior, HVAC, Piping systems

DURATION:

  • 6 months

WORKERS:

  • ~20

WORKS DONE:

  • Installation of wall & ceiling panels
  • Walls 1.000 m2
  • Ceiling 350 m2
  • Flooring
  • Floor top covering with different types 350 m2s
  • Insulation works 1.000 m2