Ro-Pax ship “Colorline Hybrid”
Dedicated Customer Teams & Agile Services
Our worldwide presence ensures the timeliness, cost efficiency compliance adherence required to ensure your production timelines are met.
SCOPE:
- Shop area
- Public area and stairs
DURATION:
- 14 months
WORKERS:
- ~90
WORKS DONE:
- Installation of wall & ceiling panels
- Walls and top covering 9.000 m2
- Ceiling with decorative elements 7.900 m2
- Floors (floating, leveling, top covering)
- Floating floor 1.500 m2
- Vinyl floor top covering 3.600 m2
- Carpet top covering 2.300 m2
- Tiling works 500 m2
- Insulation works 13.500 m2